翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ware River Railroad : ウィキペディア英語版
Massachusetts Central Railroad

The Massachusetts Central Railroad is a short line railroad in western Massachusetts, USA. It was established in 1975 to provide railroad transportation services on portions of the Boston & Maine Wheelwright Branch in and around their trackage in Bondsville (a village of Palmer) and Ware, and later between Palmer and South Barre on the old Right of Way (ROW) of the Ware River Railroad.
The old Ware River Railroad was an independent line that ran from Palmer to the Cheshire Railroad in Winchendon and was built in 1868. The first section, from Palmer to Gilbertville, opened in 1870, and the rest three years later.
Until 1873 it was leased to and operated by the New London Northern Railroad, it was eventually taken over by the Boston and Albany Railroad and run as its Winchendon Branch.
The B&A wanted to run the Ware River Line in conjunction with the Monadnock Railroad in order to gain access to the resort areas of Peterborough, NH. When the B&A failed to gain control of the Monadnock, the Ware River Line was not very profitable.
By 1968, the line came under the control of the Penn Central and tracks were abandoned between South Barre and Waterville, splitting the line in two. The Boston and Maine Railroad took over the line from Waterville to Winchendon and operated it until it was abandoned in 1984.
The Penn Central continued to operate the line south of Barre, but in 1975 all service between Gilbertville and South Barre were discontinued. Conrail operated the line between Palmer and Ware and applied for abandonment of the remainder of the line. The Commonwealth of Massachusetts acquired most of the line, excepting a few miles in Palmer to the Palmer Depot and the B&A main line. The State contracted out the continued service to the newly formed Consolidated Rail Corp. (Conrail). By 1975, the MCER, or as it later became known—the MassCentral. It was formed by three individuals from Western Massachusetts, and started limited operations on a few miles of the Boston & Maine trackage in and around the Ware Yard. After a year of Conrail operations on the State-owned line, the contract was awarded to the MassCentral. The train rarely ran north of Ware until 1999 when a new rail customer, a "reload", justified restored freight service to South Barre. Service to half a dozen customers from Palmer Village up to the Reload at South Barre continues to the present, five days a week from its interchange with CSX. From the former Intermodal Yard around mile post one next to the ex Central Vermont Railroad main line (1 customer), with other customers located at the Gibbs Crossing Transload Yard (2); in and around Ware Yard (4); and at the "Wildwood Reload" at South Barre (1), where numerous customers are provided rail to truck services, including warehousing and transloading by the reload.
==References==

*
*


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Massachusetts Central Railroad」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.